Limassol-Amathus Sewerage and Drainage Project Phase II - Miltonos Stormwater Drain
- Description:
Contract D - Provide storm and foul drainage facilities along a defined route to serve the Miltonos catchment, which comprises the installation of a storm water collection drain and a foul flow collector sewer along the construction route running from Miltonos street down to the Makria Lagoon. Excavation, construction and landscaping works to form a storage facilities for the retention preliminary treatment and controlled discharge of the storm salt lake
- Employer:
Sewerage Board of Limassol-Amathus
- Architect/Consultant:
Montgomery Watson & Ioannou
- Contract amount:€ 7,863,000 Currency Converter
- Start Date:31/12/2001
- End Date:2003